Industry News

Home / News / Industry News / Installation points of filling machine

Installation points of filling machine

Installation points of filling machine
The correct installation can better play the use effect of the filling machine. The small editor briefly summarizes the installation points of the filling machine, hoping to bring you help:
1. After the machine is unpacked, check whether the random technical data is complete and whether the machine is damaged during transportation in order to solve it in time.
2. After the machine is installed, adjust the filling track and bottle plate to level (adjust the anchor screw).
3. Insert the medicine bottle to be filled into the tooling box (20 tooling boxes are attached to each machine).
4, connect the external power supply, the power socket needs to be a three-pin socket, and reliable grounding wire, to prevent the case of leakage of electric shock.
5. Rotate the machine with the swing handle to check whether the machine is running in the correct direction (counterclockwise direction facing the main shaft of the motor), and the machine needs to be grounded.
6. Turn the power switch of the machine to ON, and the power indicator lights up, indicating that the power is connected.
7. The filling rack shall be supported by the supporting plate of the filling rack, so that the filling rack will not go down when adjusting the filling, and the liquid container for debugging shall be placed under the filling head.
8. Push up the positioning sleeve on the filling head with your fingers. The positioning sleeve should be able to move up and down flexibly, and the filling needle can be exposed or retracted without any obstacle.
9. Turn the switch under the liquid storage barrel to the open position so that the liquid can flow into the total metering pump.